TapBill Get the app

Flooring invoice template

This flooring invoice template bills an engineered wood install with material and labor on separate lines, waste included. Change the areas and rates to yours, and download it as a PDF.

Free, no sign-up. It opens in our invoice generator with these lines filled in, and you download a PDF.

Brandywine Floor Co.1407 N Union St, Wilmington, DE 19806(302) 555-0136[email protected]
INVOICENo. 1042Date 11/20/2026Due 12/04/2026
Bill toElena & Sam Ruiz2210 Baynard Blvd, Wilmington, DE 19802
DescriptionQtyRateAmount
Remove and haul away old carpet and pad (sq ft)540$0.85$459.00
Self-leveler at low spots (bags)6$48.00$288.00
Engineered oak, 7 in plank, 3mm wear layer, +10% waste (sq ft)594$5.40$3,207.60
Install engineered plank, glue-down (sq ft)540$3.25$1,755.00
Stair nose and transitions to tile (pieces)4$38.00$152.00
New quarter round, primed and installed (linear ft)160$2.75$440.00
Subtotal$6,301.60
Total due$6,301.60
Notes

Living room, dining room and hall, 540 sq ft. 2 unopened boxes of planks left with you for future repairs. Due in 7 days.

Example flooring invoice. The business, client and prices are made up - set your own rates.

What a flooring invoice should include

Flooring clients have usually looked up plank prices online before you arrive, so the material line is the first one they check. The invoice above, for Elena and Sam Ruiz, makes that line easy to follow and keeps the labor separate.

  • Material and labor on separate lines. Engineered oak at a price per square foot, then the glue-down install at its own rate. The client can compare the plank with what they saw in the store, and the work with other installers.
  • Waste on the material line. 594 sq ft of planks for 540 sq ft of floor, marked "+10% waste." Without it, the client sees two different areas and thinks one is a mistake.
  • What the product is. "7 in plank, 3mm wear layer." The wear layer is the real wood on top, and it decides whether the floor can be sanded and refinished later. It's worth having on paper.
  • Prep as its own work. Tearing out the old carpet and pad, and 6 bags of self-leveler for the low spots. Prep is where surprises happen, and a line per task shows what the floor needed before any plank went down.
  • How it was installed. Glue-down costs more than floating, and the client should know which one they paid for.
  • Trim and transitions. Stair nose and transitions by the piece, quarter round by the linear foot. These finish the job, and they're easy to forget on a quote.
  • Leftover material in the notes. "2 unopened boxes left with you for future repairs." When a plank gets damaged in five years, the client will be glad you kept matching ones.

Delaware, where the example business is, has no sales tax. In other states, how flooring material and installation are taxed varies, so check your state's rules before you add any.

How to write a flooring invoice

  1. Use the areas from your estimate. Room by room, the same square feet you quoted. If a room changed, say so in the notes.
  2. Put the waste on the material line. Write the percentage in the description, so the extra square feet explain themselves.
  3. Bill the prep you actually did. Bags of leveler used, old flooring removed, any repairs the client approved. Count them, don't guess.
  4. Count the trim. Transitions and stair noses by the piece, base or quarter round by the linear foot.
  5. Note what you left behind. Spare boxes, the product name and color. It saves a search when a repair is needed.
  6. Show the finished floor. Photos of the old carpet and the new floor make the best record of the job. A TapBill invoice can carry up to six of them.
  7. Show any deposit. If the client paid a deposit when they signed, write the amount in the notes so the balance due is clear.

Use this flooring invoice template

Before the job, quote it with the flooring estimate template, which prices a kitchen tile floor with a tile allowance. When the floor is part of a bigger remodel, the construction invoice template shows how to bill in stages. For small fixes after the install, like a door that needs trimming, see the handyman invoice.

Frequently asked questions

What should a flooring invoice include?

Your business and the client, an invoice number, the date and the due date. Then the prep work, the material with its waste allowance, the installation by the square foot, the trim and transitions, and the total. The notes cover the rooms, leftover material and any deposit paid.

Should I list flooring material and labor separately?

Yes, for most jobs. Clients compare material prices online and installation prices between contractors, and separate lines let them do both. It also makes it clear who paid for what if the client supplied the material themselves.

How much waste should I add for flooring?

It depends on the product, the room shapes and the layout. A straight lay in square rooms needs less than diagonal, herringbone or a lot of small rooms. The sample adds 10%. Whatever you use, write it on the material line.

How do I bill for subfloor problems I find during the job?

Stop and show the client, write a change order with the extra work and get their approval before you go on. Then bill it as a separate line, so it doesn't look like the original price went up.

Next time, write it at the job.

TapBill on iPhone keeps your clients and prices, turns an approved estimate into an invoice in one tap, adds job photos and your client's signature, and works without a signal.

Download on the App Store