Contractor invoice template

This contractor invoice template is a filled-in construction invoice for a remodel paid in stages. The example is progress invoice 2 of 3 on a general contractor's kitchen job, with subcontractor work, a change order and the permit. Swap in your own job and download the PDF.

Free, no sign-up. It opens in our invoice generator with these lines filled in, and you download a PDF.

Keystone Build & Remodel2150 W 29th Ave, Denver, CO 80211(720) 555-0151[email protected]
INVOICENo. 1042Date 11/20/2026Due 12/04/2026
Bill toDaniel & Rosa Kim4471 Perry St, Denver, CO 80212
DescriptionQtyRateAmount
Demolition and haul-off, kitchen and pantry wall1$2,850.00$2,850.00
Remove pantry wall, install LVL header1$3,400.00$3,400.00
Plumbing rough-in by licensed sub, sink moved 6 ft1$2,150.00$2,150.00
Electrical rough-in by licensed sub, 6 new circuits1$3,600.00$3,600.00
Drywall hang, tape and finish (sheets)38$62.00$2,356.00
Change order #1 - under-cabinet lighting1$680.00$680.00
Building permit and inspections, at cost1$465.00$465.00
Subtotal$15,501.00
Total due$15,501.00
Notes

Progress invoice 2 of 3 on the kitchen remodel contract of Sept 8. The deposit is already paid and is not billed again here. Due in 10 days.

Example general contractor invoice. The business, client and prices are made up - set your own rates.

What a contractor or construction invoice should include

A general contractor rarely sends one bill at the end. A remodel is paid in stages - a deposit, one or more progress invoices, then the final one - and every contractor invoice has to show which part of the job it covers, so the client can hold it up against the contract. The example above is the second of three.

  • Which invoice this is, out of how many. "Progress invoice 2 of 3" in the notes, with the date of the contract it belongs to. The client sees at a glance where the job stands and what's still to come.
  • Only the work finished in this stage. Demolition, the new header, both rough-ins and the drywall are billed now because they're done. Cabinets, counters and the backsplash wait for the final invoice.
  • Subcontracted trades on their own lines. "Plumbing rough-in by licensed sub" and "Electrical rough-in by licensed sub" tell the client that licensed trades did the regulated work, and what that work cost.
  • Change orders billed by number. The under-cabinet lighting wasn't in the contract. Writing "Change order #1" on the line, matching the change order the client signed, ends the "I never agreed to that" conversation before it starts.
  • Permits at cost. The building permit and inspections are a pass-through, and the line says so. Nobody has to wonder whether you marked them up.
  • What's already been paid. The note says the deposit is paid and isn't billed again. If your contract takes the deposit off each progress invoice instead, write the amount and where it came from.

There's no sales tax on the example. Whether a remodeling contractor charges sales tax to the client, or pays it on materials when buying them, depends on the state and the kind of job, so check with your state's revenue department before you set up your invoices.

How to write a contractor invoice for a job paid in stages

  1. Put the payment schedule in the contract. The deposit, the milestones that trigger each progress invoice, and the final payment. After that, every invoice simply follows the schedule.
  2. Invoice at the milestone, not at the end of the month. When the rough-ins pass inspection, send that invoice the same day, while the client can still see the open walls they're paying for.
  3. Use the estimate's wording. Clients compare the two documents line by line. If the estimate said "Remove pantry wall, install LVL header", the invoice says exactly that.
  4. Add a change order only once it's signed, as its own line with its number and the agreed price. Never fold it into another line.
  5. Keep a running total. Contract amount, paid so far, this invoice, and what's left. A client who can see the whole picture pays faster than one who has to work it out.
  6. Send it from the job site. TapBill on iPhone turns the approved estimate into an invoice in one tap, adds photos of the finished stage, and puts a pay button on the invoice for your own payment link.

Use this general contractor invoice template

Before the work starts, the construction estimate template shows how to price a basement finish with allowances, exclusions and a payment schedule. If you hire out the trades, see what the electrical invoice and the plumbing invoice look like from the subcontractor's side. For small jobs between remodels, the handyman invoice prices task by task, and when a progress payment lands, a payment receipt confirms it.

Frequently asked questions

Can I use this as a construction invoice template?

Yes. It's built for construction and remodeling work: the lines are billed by scope, subcontracted trades and change orders have their own lines, and the notes say which progress invoice this is. Open it in the free invoice generator, replace the kitchen job with yours, and download the PDF. There's no sign-up.

What is a progress invoice?

An invoice for one stage of a job that's paid in parts. Each progress invoice bills the work finished since the last one, so the client pays as the job moves instead of in one large sum at the end. The stage number ("2 of 3") and the contract date tie it back to the agreement.

Should a contractor invoice split labor and materials?

On a remodel, most lines are billed by scope, with labor and materials together, as in the example: "Drywall hang, tape and finish" at a price per sheet. Split them when the contract is time and materials, or when the client buys materials through you at cost and wants to see the receipts.

How do I add a change order to an invoice?

Give it its own line with the change order number and the price the client signed for, and bill it in the stage when the work was done. Keeping it separate makes it easy to match to the signed change order.

What is retainage on a contractor invoice?

Retainage is part of each payment that the client holds back until the job is finished. It mostly comes up on larger and commercial contracts. If your contract has it, write the amount held back in the notes of each invoice and bill the total on the final one.

Is this template for independent contractors too?

It's built for construction and remodeling. If you're a freelancer or an independent contractor billing hours, start from a blank invoice in the invoice generator: one line per task, with the hours as the quantity and your hourly rate as the rate.

Next time, write it at the job.

TapBill on iPhone keeps your clients and prices, turns an approved estimate into an invoice in one tap, adds job photos and your client's signature, and works without a signal.

Download on the App Store