Construction estimate template

This construction estimate template is a filled-in contractor estimate for a 650 sq ft basement finish, priced line by line from framing to flooring, with what's excluded and how the payments are split. Open it in the generator and make it your job.

Free, no sign-up. It opens in our estimate generator with these lines filled in, and you download a PDF.

Keystone Build & Remodel2150 W 29th Ave, Denver, CO 80211(720) 555-0151[email protected]
ESTIMATENo. E-1042Date 11/20/2026Valid until 12/20/2026
Prepared forAlicia Moreno1835 S Pearl St, Denver, CO 80210
DescriptionQtyRateAmount
Frame perimeter walls and 2 bedrooms (linear ft)210$24.00$5,040.00
R-13 batt insulation on exterior walls (sq ft)980$1.60$1,568.00
Electrical by licensed sub: 18 outlets, 12 recessed lights1$6,200.00$6,200.00
Plumbing by licensed sub: rough-in for a 3/4 bath1$4,800.00$4,800.00
Drywall, level 4 finish (sq ft)2400$2.35$5,640.00
Doors, trim and paint, 2 bedrooms and hallway1$4,350.00$4,350.00
Luxury vinyl plank flooring, installed (sq ft)650$6.50$4,225.00
Allowance: bath vanity, toilet and shower kit1$1,800.00$1,800.00
Permits, inspections and dumpster1$1,450.00$1,450.00
Subtotal$35,073.00
Estimated total$35,073.00
Notes

Basement finish, about 650 sq ft, roughly 6 weeks. 10% deposit to book, progress payments at rough-in and drywall, balance at final inspection. Valid 30 days.

Example construction estimate. The business, client and prices are made up - set your own rates.

What a construction estimate should include

A construction estimate is the document the contract gets written from. Every line becomes something you'll be held to, so it has to say what's included, how much of it, and what isn't. The basement example above does that in nine lines.

  • Quantities in the units you measured. 210 linear feet of framing, 980 sq ft of insulation, 2,400 sq ft of drywall. A client comparing three bids can see you measured their basement instead of guessing at it.
  • Subcontracted trades named as such. The electrical and plumbing lines say "by licensed sub". The client knows who does the regulated work, and your price for it is in writing.
  • An allowance for what the client hasn't chosen. "Allowance: bath vanity, toilet and shower kit" holds $1,800 for fixtures nobody has picked yet. If the client picks pricier ones, the difference becomes a change order instead of an argument.
  • Permits, inspections and the dumpster on one visible line. They're real costs of the job. Listed openly, they don't look like padding hidden in the other prices.
  • Exclusions for what you can't see. The example leaves out an egress window, foundation or moisture repair, and furniture and appliances. Basements hide water problems, and saying up front that fixing them isn't in the price protects both of you.
  • A payment schedule tied to stages. 10% to book, progress payments at rough-in and at drywall, the balance at final inspection. Some states limit how big a deposit a home improvement contractor can take, so check your state's rules before you set the first payment.
  • How long the price holds. Thirty days here. If material prices jump after that, you can re-price instead of absorbing the increase.

Some contractors also add a contingency line for surprises. If you do, say what it covers and that any part you don't use isn't billed.

How to write a contractor estimate for a construction job

  1. Measure on site and photograph everything. Wall lengths, ceiling height, the electrical panel, the floor drain, any sign of water. You'll price from the photos later at your desk.
  2. Get the subcontractor quotes first. Your electrical and plumbing lines are only as firm as the quotes behind them, so don't send the estimate until you have them.
  3. Price each line from your own costs. Materials, labor hours and equipment, then your overhead and your profit. Keep a price list so framing per foot costs the same on every job you quote.
  4. Use allowances for finishes the client hasn't picked, and say in the notes what happens if their choice costs more or less.
  5. Write the exclusions before the client asks. Anything behind the walls, under the slab or outside the scope you walked goes on the list.
  6. Set the payment stages and the valid-until date, then get it signed. In TapBill the client signs the estimate on your phone, and when the job starts one tap turns it into the first invoice.

Use this construction estimate template

Once the work is under way, the contractor invoice template shows a progress invoice with subcontractor lines and a change order. For a single-trade job, compare the roofing estimate, which prices a storm repair with hidden decking excluded, and the electrical estimate for a panel upgrade. Or start a blank one in the estimate generator.

Frequently asked questions

Is there a free contractor estimate template I can fill in?

Yes, the one on this page. It opens in the free estimate generator with the basement finish filled in, including the exclusions and the payment stages. Replace the lines, quantities and prices with your job, then download the estimate as a PDF. There's no sign-up.

How do I estimate a construction project?

Break the job into the stages it's built in, measure each one, and price it from your costs plus overhead and profit. Add the subcontractor quotes, an allowance for anything the client hasn't chosen, the permits and disposal, then the exclusions and the payment schedule.

What is an allowance in a construction estimate?

A set amount reserved for something the client will choose later, like fixtures, tile or lighting. The estimate states the amount. If the final choice costs more, the client pays the difference; if it costs less, they get it back.

Should a construction estimate include a contingency?

It can, especially on remodels where you can't see inside the walls. Show it as its own line, say what it's for, and agree that unused contingency isn't billed. A contingency hidden inside other prices makes your bid look high and is hard to explain later.

How long is a construction estimate valid?

As long as you're willing to hold the prices. The example says 30 days. Material costs move, so a date on the estimate tells the client when they need to decide and leaves you free to update the price after it.