What a flooring estimate should include
Marcus Webb hasn't picked his tile yet, but he wants a price now. The sample above solves that with an allowance, so the estimate is complete today and only one line changes when he chooses.
- A tile allowance. "Porcelain tile 12x24, allowance $4/sq ft." The price includes tile up to that amount. If he picks a $6 tile, only that line changes, and the notes say so.
- Waste built into the tile line. 231 sq ft of tile for a 210 sq ft floor, marked "+10% waste." Tile breaks during cutting, and the extra is part of the job.
- The layer under the tile. Cement board, screwed and taped. Tile needs a stiff, stable base, and this line is why a tile floor costs more than the tile.
- Tear-out on its own line. Removing the old sheet vinyl and underlayment is real work. Kept separate, it's clear what part of the price is demolition.
- Install by the square foot. "Tile install, thinset, 1/8 in joints." The joint size is a choice the client will see every day, so put it on paper.
- The finishing work. Grout and sealer, color picked by the client. Grout color changes how the floor looks more than most people expect.
- What has to move. Pulling and resetting the dishwasher and the washer. Clients forget that appliances sit on the floor too.
- What's not included. Subfloor repair if rot is found, baseboard paint touch-up, and work on the refrigerator water line. Rot near a dishwasher is common, so say what happens if you find it.
How to write a flooring estimate
- Measure every room and doorway. Note where the new floor meets another one, and how big the height difference is. Transitions are easier to price before the tile is down.
- Check the subfloor. Bounce, soft spots, old water damage near the sink or dishwasher. Write down what you found and what you couldn't see.
- Name the product or set an allowance. If the client has chosen, put the product, size and finish on the line. If not, use an allowance with a clear price per square foot.
- Separate demolition, prep, material and install. Four kinds of cost, four lines. The client can see each one, and so can you when the job runs long.
- List what has to move. Appliances, toilets, doors that may need trimming. Each is a small line now instead of a surprise later.
- Say how long the floor is out of use. Tile needs time before it can be walked on and grouted. Give the number of days so the client can plan meals and laundry.
- Get it signed before you order. With TapBill the client signs on your phone, and the signed estimate becomes the invoice in one tap.
Use this flooring estimate template
After the install, the flooring invoice template bills an engineered wood floor with material, labor and trim apart. Floors that are part of a whole remodel are quoted in the construction estimate. If the dishwasher or washer needs new hookups, the plumbing estimate shows how that work is priced.
Frequently asked questions
How do you write a flooring estimate?
Measure the rooms, check the subfloor, then list the tear-out, prep, material with waste, installation and trim as separate lines. Finish with what's excluded, how long the floor will be out of use, the deposit and how long the price is good for.
What is a material allowance on an estimate?
It's an amount included for something the client hasn't chosen yet, like tile at $4 per square foot. If they choose something cheaper or pricier, the difference is added or taken off that line. Say how the change will be handled in the notes.
Should I quote flooring per square foot or as one price?
Per square foot for the material and install, so the client can see how size changes the price. Fixed prices suit the small, defined tasks, like resetting an appliance or a set number of transitions. The sample uses both.
What if I find rot under the old floor?
Stop and show the client before you cover it. The sample excludes subfloor repair, so it becomes a change order with its own price. The client approves it before you carry on.